Professional drilling solutions for your project

Reliability. Experience. Results.

  • Exploration drilling
  • Construction drilling
  • Specialized solutions

01 — The company

About the company

Deep State United is a team of professionals united by experience, modern equipment and a responsible approach to every project.

  • Quality in every detail
  • Safety at every stage
  • On-time delivery
TETRA drilling rigs in a quarry at golden hour

02 — Track record

Our results

of drilling completed
20,000+ m
drilling rigs
4

03 — Services

Our areas of work

  • Geological exploration

    Core drilling for geological studies and mineral exploration.

  • Engineering surveys

    Boreholes for investigating ground conditions at proposed construction sites.

  • Construction drilling

    Drilling for construction and infrastructure projects to the specified depth and diameter.

  • Special projects

    Drilling programs tailored to the site and the technical assignment.

04 — Equipment

Our equipment

Modern equipment for efficient and safe work in any conditions.

TETRA TD 2500

High-performance drilling rig

  1. Pull force22,600 kg

    Rated hoisting capacity when lifting the drill string

  2. Feed force12,000 kg

    Controlled pressure on the bottom hole

  3. Feed stroke3.5 m

    Optimal stroke length for standard drill rods

  4. Maximum drilling depth3,000 m
    BQ
    Up to 3,000 m
    NQ
    Up to 2,500 m
    HQ
    Up to 1,900 m
    PQ
    Up to 1,000 m

05 — HOW WE WORK

How we work together

From the technical assignment to handover — transparent and controlled at every stage.

  1. STEP 01

    Receiving the technical assignment

    We study your request, drilling objectives and site requirements.

    Outcomea clearly defined task

  2. STEP 02

    Analysis of conditions and scope

    We assess geological conditions, depth, drilling type and logistics to the site.

    Outcomea technically sound work plan

  3. STEP 03

    Preparing the commercial proposal

    We calculate cost and timelines individually for your project.

    Outcomea transparent proposal with no hidden terms

  4. STEP 04

    Equipment mobilization

    We deliver drilling rigs, equipment and crew to the site.

    Outcomeready to start on the agreed date

  5. STEP 05

    Drilling operations

    We drill in line with the technology and safety requirements.

    Outcomesteady progress and control at every metre

  6. STEP 06

    Quality control and handover

    We check the results, prepare the documentation and hand the work over to the client.

    Outcomework accepted without remarks

06 — Why work with us

Our advantages

  • Experienced team of professionals

  • Modern equipment fleet

  • Flexible approach to every project

  • Responsibility at every stage

07 — CONTACT

Commercial offer

Deep State United is ready to discuss cooperation and carry out drilling works according to the client's technical assignment.

Cost and timelines are calculated individually, depending on:

  • Drilling depth
  • Drilling diameter and type
  • Geological conditions
  • Scope of work
  • Site remoteness
  • Client requirements
+998 99 988 54 4520 Oybek Street, Mirabad District, Tashkent